| |
|
|
| Industrial Hygiene - Asbestos Management |
|
|
|
| MS Environmental Solutions, Inc., has provided services exclusively for California’s Public Schools and Colleges since 1992. Our success comes from returning clients that have come to trust our ethics, professionalism and quality of work, honesty and sensitivity to cost. We offer our professional team’s breath of knowledge and experience and pledge that as your Agent we will protect your interests and make certain our procedures comply with all relevant regulations. |
|
| MSES has worked directly with several architectural, bond management & construction firms in various capacities involving Bond Management Programs at school districts. |
|
| These firms include: |
|
 |
Baker Vilar Architects, 1516 Park Avenue, Emeryville, CA |
|
|
 |
DES Architects, 399 Bradford Street, Redwood City, CA |
|
|
 |
Powell and Partners Architects, 405 14th Street, Oakland, CA |
|
|
 |
Arthur Tam and Associates, 300 - 27th Street, Oakland, CA |
|
|
 |
BFGC Architects, 350 Frank Ogawa Plaza, Oakland, CA |
|
|
 |
HTI Architects, 1830 Embarcadero, Oakland, CA |
|
|
 |
Interactive Resources Architects and Engineers, 117 Park Place, Point Richmond, CA |
|
|
 |
BCA, Bunton Clifford Associates, Inc., 210 Hammond Ave., Fremont, CA |
|
|
 |
WCL Architects and Engineers, 1250 45th Street, Suite 150, Emeryville, CA |
|
|
 |
Vanir Construction Management, Inc., 980 Ninth Street, Suite 900, Sacramento, CA |
|
|
 |
The Seville Group, Inc., 1300 Potrero Avenue, Richmond, CA |
|
| MSES professionals are AHERA and NESHAP trained in the following areas: (1) performing building inspections, (2) preparing abatement specifications including architectural drawings, (3) supervising abatement projects, and (4) preparing close out documentation consistent with the District’s AHERA and NESHAP program. MSES personnel have achieved accreditation in each of these areas by attending EPA approved courses and passing written examinations. MSES provides Table 1 on below contract elements and the type of personnel required for modernization projects. |
|
| Table 1 - Modernization Contract Elements |
|
 |
General Scope Description |
 |
General Scope Description |
 |
| |
|
|
 |
Preliminary Site Reconnaissance – Drawings Review, Ground Surveys and Historical Records Search |
|
|
 |
Detailed Site Surveys and Sampling Site Inspections including intrusive bulk sampling for asbestos and lead. Universal waste such as mercury switches and fluorescent light tubes are quantified. |
|
|
 |
Develop Supplemental Surveys and Specifications. It may include AutoCAD drawings. |
|
|
 |
Bidding Phase / Pre-construction meetings |
|
|
 |
Abatement Contractor Work Plan and Health and Safety Submittal Review |
|
|
 |
Project Monitoring, Environmental Monitoring, Site Coordination & Weekly Site Meetings during Construction and Clearance Air Testing |
|
|
 |
Project Closeout documentation provided in hardbound format and/or electronically via website |
|
|
|
|
|
| |
 |
Project Manager, CAC Certified Lead Consultant
Environmental Data Specialist |
|
|
|
| |
 |
Project Manager, CAC, Certified Lead Consultant, Field Industrial Hygienist, Environmental Data Specialist |
|
|
|
| |
 |
Project Manager, CAC, Environmental Data Specialist |
|
|
|
| |
 |
Project Manager, CAC |
|
|
|
| |
 |
Project Manager, CAC |
|
|
|
| |
 |
Project Manager, CAC, Certified Lead Consultant, Field Industrial Hygienist, Environmental Data Specialist |
|
|
|
| |
 |
Project Manager, CAC, Field Industrial Hygienist, Environmental Data Specialist |
|
|
|
|
|
|
 |
|
 |
|
 |
|
| |
| Selected Asbestos and Lead Project Experience |
|
| School District Name and Point of Contact |
Project Title, Location and Description |
Contract Elements |
West Contra Costa USD1108 Bissell
Avenue Richmond, CA 94804 |
NESHAP Engineering Surveys at 11 school sites located in the cities of Richmond, El Cerrito, Pinole and San Pablo, CA.
Asbestos and Lead Abatement Specifications, Site Surveillance and Project Closeout.
Subsurface Investigations, Underground Storage Tank Removal, Phase I and II Site Assessments.
Period of Performance: 2003 to present (some project sites completed and new sites assigned) |
Preliminary Site Reconnaissance's, Drawings Review, Ground Surveys and Historical Records Search.
Detailed Site Surveys and Sampling Site Inspections including intrusive bulk sampling for asbestos and lead. Universal waste such as mercury switches and fluorescent light tubes are quantified.
Develop Supplemental Surveys and Specifications. It may include AutoCAD drawings.
Bidding Phase/Preconstruction Meetings.
Abatement Contractor Work Plans and Health & Safety Submittal Review.
Project Monitoring - Environmental Monitoring, Site Coordination & Weekly Site Meetings During Construction and Clearance Air Testing.
Project Closeout documentation provided in hardbound format and/or electronically via web site.
|
| |
|
|
| Kitchell CEM/ Solano Community College District 4000 Suisun Valley Road Fairfield, CA 94534-3197 |
Industrial Hygienist Services for Buildings 300, 500 and 1500 Modernization, Bid 05-002. Also Buildings 700, 800, 1400, 1700, and 1800.
Asbestos and Lead Abatement Response Action Plan, Site Surveillance and Project Closeout.
Period of Performance: June 2005 to present (some project sites completed and new sites assigned) |
Project Monitoring - Environmental Monitoring, Site Compliance, and Coordination & Weekly Site Meetings During Construction and Clearance Air Testing.
Project Closeout documentation provided in hardbound format and/or electronically via web site. |
|
|
|
| San Ramon Valley USD 3281 E. Crow Canyon Blvd. San Ramon, CA 94583 |
Comprehensive Environmental Consulting Services
NESHAP Engineering Surveys for 13 school sites involving demolition and renovation.
Developed District AHERA surveys for 22 sites and district-wide Asbestos Management Plan
Period of Performance: 2004 to present (some project sites completed and new sites assigned)
|
Drawings Review.
Detailed Site Surveys and Sampling Site Inspections including intrusive bulk sampling for asbestos and lead. Universal waste such as mercury switches and fluorescent light tubes are quantified.
Develop Supplemental Surveys and Specifications. It may include AutoCAD drawings.
Abatement Contractor Work Plans and Health & Safety Submittal Review.
Project Monitoring - Environmental Monitoring, Site Coordination & Weekly Site Meetings During Construction and Clearance Air Testing.
Project Closeout documentation provided in hardbound format and/or electronically via web site
|
|
|
|
Mt. Diablo USD 1480 Gasoline Alley
Concord, CA 94520 |
Comprehensive Environmental Consulting Services
NESHAP Engineering Surveys and specifications for over 25 sites. Services include site surveillance and clearance for renovation work.
Period of Performance: 2004 to present (some project sites completed and new sites assigned)
|
Preliminary Site Reconnaissance's, Drawings Review, Ground Surveys and Historical Records Search.
Detailed Site Surveys and Sampling Site Inspections including intrusive bulk sampling for asbestos and lead. Universal waste such as mercury switches and fluorescent light tubes are quantified.
Develop Supplemental Surveys and Specifications. It may include AutoCAD drawings.
Bidding Phase/Preconstruction Meetings.
Abatement Contractor Work Plans and Health & Safety Submittal Review.
Project Monitoring - Environmental
Monitoring, Site Coordination & Weekly
Site Meetings During Construction and
Clearance Air Testing.
Project Closeout documentation provided in hardbound format and/or electronically via web site.
|
|
|
|
|
|
|